Construction of 25 KMs long 400 KV Double Circuit Conductors, Double Circuit Transmission Line from Jabalpur to Jaisingh Nagar in association with Indian Railway Construction Company Limited for National Thermal Power Corporation Limited. The scope involved concrete foundation, 400 MT of tower erection, stringing of 6 line conductors, earth wire and other protective works including testing and commissioning.
300 Circuit KM stringing Transmission Line Projects carried out for the Kerala State Electricity Board
The scope of transmission line works includes excavation, concreting of foundations, erection of towers, installation of insulators and stringing of various types of conductors. The line is passing through the river crossing, hilly terrain, forest area public places etc. and all related construction problems have to be sorted out during the execution period.
v
Construction of 25 Kms of 110 KV Double Circuit Transmission Line from Edamalayar to Chalakudy.
v
Construction of 108 KMs long 220 KV Double Circuit Transmission Line from Calicut to Kannur. The scope involved stub setting work at 341 Locations, tower erection and stringing works.
v
Erection and stringing of 70 Kms. long 220 KV DC Transmission Line from Areacode to Panjal and 18 Kms. long 220 KV DC Transmission Line from Villanchira to Mylore.
v
Construction of 26 Kms long 220 KV DC Transmission Line from Kannur to Kasaragod (Reach IV & V) for Kerala State Electricity Board.
v
Construction of 22 Kms. long of 220 KV DC Transmission Line from Mylore to Kochi.
v
Construction of 35 KM long 220 KV DC Transmission line from Moolamattom Power House, Idukki to Lower Periyar Generator Station.
v
Providing earth-mat at 220 KV Sub-station, Cannanore and providing earth- mat at 110 KV Sub-Station, Chevayoor, Calicut.